Manual test runs
A Test Run is a collection of instances of test cases with necessary information like who is handling the involved test cases at a particular time and the state they are in which can be untested, passed, failed, blocked, skipped or to be retested.
Create manual test runs
Log in to Test Management and click Test Run on the left navigation panel.
Click Create Test Run on the top-right corner.
The current date appends to the Test Run name. Click Update link in the Test Cases section.
Apply filters based on Owner, Priority, and Tags to search and select test cases, and then click Select <number> Test Case.
Click Create Run.
Add Status
- Click ID or TITLE of the test run to open the executed Test Run.
- From the Status dropdown menu, select the test run status.
- To add or modify a test case or to connect it to a JIRA issue, click the test case ID or TITLE. Then, you can perform the required action on the slide over menu.
Add Notes and Attachments to Test Case result
You can add notes and attachments to the test case while adding the result.
- Select a test case in Test Runs.
- Click Add Result under Results tab in TEST CASE DETAILS slide over.
- Enter Add Notes and upload a file in Attachments. Then click Add Result to add result to the test case with notes and attachments.
Test Run State
You can check the state New, In Progress, Under Review, Rejected, Done, or Closed of the selected test run, as shown in the following screenshot.
Search and filter test cases
You can search for test cases using specific keywords by typing them into the search bar.
You can also apply filters to search and select the specific test cases based on Status, Priority, Assignee, and Test Case Type.
You can also perform bulk actions on seleted test cases:
- Add Result to add same result to the selected test cases.
- Assign to to assign the selected test cases to a different user.
- Remove from Run to remove the selected tests from the partcular test run.
Clone Test Runs
To reuse the existing active or closed Test Runs, clone the Test Runs.
To clone a Test Run:
Click the kebab menu of the Test Run you want to clone, and select Clone Run.
Enter Test Run Name.
Select the test cases to include in the clone.
-
All test cases.
It shows the number of test cases in the original Test Run. All these test cases, by default, will be added in the Clone Test Run. -
By test case results.
Based on test case status, it allows you to select any one or a combination of passed, failed, retested, blocked, skipped, or untested test cases.
If you do not select any test case, it creates an empty clone of the Test Run without a test case.
Select from the below options if you want to include information from the original test run.
-
Copy Test Case Assignee to new test run
Copies the assignee names associated with different test cases selected for the clone test run operation. If you leave it unchecked, all the test cases will be set as unassigned. -
Copy Tags to new test run
Copies the tags associated with different test runs selected for the clone test run operation. -
Copy Linked Issues to the new test run
Copies linked issues from different test runs selected for the clone test run operation.
Click Clone.
A pop-up appears, indicating the Test Run is cloned. The Clone Test Run appears under Active Runs in the Test Runs Dashboard irrespective of whether the original Test Run is Active or Closed.
We're sorry to hear that. Please share your feedback so we can do better
Contact our Support team for immediate help while we work on improving our docs.
We're continuously improving our docs. We'd love to know what you liked
We're sorry to hear that. Please share your feedback so we can do better
Contact our Support team for immediate help while we work on improving our docs.
We're continuously improving our docs. We'd love to know what you liked
Thank you for your valuable feedback!